Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/17/2018 PERMIT SUB-TYPE: CNEW PERMIT NO: B18-00309
JOB ADDRESS:
2725 NATURE WAY
FRISCO, TX 75033
DESC:   20045 SQ FT, CNEW / IVY KIDS EARLY LEARNING CENTER
OWNER:
HANIFAH 786, LLC

MCKINNEY TX 75072-5223

CONTRACTOR:
DUVAL COMMERCIAL CONTRUCTION LLC

DALLAS TX 75254
ISSUED DATE:
2/4/2019
APPLIED DATE:
1/18/2018
EXPIRED DATE:
9/27/2020
SITE APN:
D662263
STATUS:
COMPLETED
APPLICANT:
HANIFAH 7

CARROLLTON TX 75007
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
3500000
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$1.00
CREDIT CARD FEE$4.08
FIRE DEPT INSPECTION FEES$50.00
CREDIT CARD FEE$1,479.64
CREDIT CARD FEE$4.30
COMMERCIAL FEE$750.00
COMMERCIAL BUILDING PERMIT FEE$8,092.14
MISCELLANOUS MECHANICAL FEES$901.00
MISCELLANEOUS PLUMBING FEES$1,651.00
THOROUGHFARE IMPACT FEE$31,034.00
WATER IMPACT FEE$18,604.00
SEWER IMPACT FEE$12,950.00
FIRE DEPT INSPECTION FEES$75.00
FIRE DEPT INSPECTION FEES$204.00
FIRE DEPT INSPECTION FEES$651.35
COMM FRAME 05/29/2019 REED$35.00
ELECTRICAL ROUGH IN 07/08/2019 REED$35.00
CEILING 07/19/2019 REED$35.00
CEILING 07/30/2019 REED$35.00
COMM PLUMB TOP OUT 04/30/2019 RR$35.00
MECHANICAL ROUGH 05/30/2019 RR$35.00
MECHANICAL ROUGH 05/30/2019 RR$35.00
2 INCH T-10 METER$800.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
SET 2 T-10 METER 08/30/2019 JCM$80.00
ILLEGAL JUMPER$500.00
Total Fees:$79,201.51
______  PIER
______  PIER
______  AUTOFIRE SPRK HYDRO
______  UNDRGR FIRE MAIN VIS
______  PIER
______  UNDRGR FIRE MAIN HYD
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PAVING
______  PAVING
______  ELECTRICAL ROUGH IN
______  PIER
______  GREASE TRAP
______  GREASE TRAP
______  COMM SLAB
______  ELECTRICAL ROUGH IN
______  PLUMBING ROUGH-IN
______  UNDRGR FIRE MAIN HYD
______  UNDRGR FIRE MAIN FLU
______  FIRELANE INSPECTION
______  SHEATHING
______  COMM PLUMB TOP OUT
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  MECHANICAL ROUGH
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  MECHANICAL ROUGH
______  GAS PRESSURE
______  COMM SLAB
______  COMM FRAME
______  GAS PRESSURE
______  GAS PRESSURE
______  MECHANICAL ROUGH
______  BRICK AND WALL TIES
______  INSULATION RES
______  LATH
______  COMM DRYWALL
______  COMM DRYWALL
______  ELECTRICAL RELEASE
______  PIER
______  ELECTRICAL ROUGH IN
______  ELECTRICAL ROUGH IN
______  CEILING
______  FLATWORK
______  CEILING
______  MECHANICAL ROUGH
______  FLATWORK
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  FLATWORK
______  CEILING
______  FOOTINGS
______  AUTO FIRE SPRINKLER
______  FLATWORK
______  FOOTINGS
______  ELECT FINAL RES
______  MECHANICAL FINAL
______  METER PAYMENT
______  ELECT FINAL RES
______  GAS PRESSURE
______  GAS RELEASE
______  SET 2 T-10 METER
______  SET 2 T-10 METER
______  PLUMBING FINAL
______  FIRE FINAL
______  FIRE FINAL
______  BUILDING FINAL
______  COMM CO
______  COMM CO
______  COMM CO
______  COURTESY HEALTH INSP
______  COURTESY HEALTH INSP
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)