Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/13/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B18-00180
JOB ADDRESS:
16597 PRAIRIE OAK RD
FRISCO, TX
DESC:   3814 AC, 4951 SF, SFR / 2 STORY
OWNER:
HIGHLAND HOMES DALLAS LLC

PLANO TX 75024-3674

CONTRACTOR:
HIGHLAND HOMES
SUITE 300
PLANO TX 75024
ISSUED DATE:
2/22/2018
APPLIED DATE:
12/29/2017
EXPIRED DATE:
3/13/2019
SITE APN:
D681927
STATUS:
COMPLETED
APPLICANT:
HIGHLAND HOMES
SUITE 300
PLANO TX 75024
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
284562.54
FEE SUMMARY
INSPECTION SUMMARY
PLUMBTOPOUT/MECHRGH 04/13/2018 ARG$30.00
PLUMBTOPOUT/MECHRGH 04/18/2018 ARG$30.00
2NDS/FRAMING 04/24/2018 CCM$30.00
INSULATION 05/01/2018 CCM$30.00
GAS RELEASE 06/22/2018 CI$30.00
GAS RELEASE 06/26/2018 CI$30.00
GAS RELEASE 07/03/2018 CI$30.00
PLUMBMECHFINAL 08/14/2018 CK$30.00
THOROUGHFARE IMPACT FEE$0.00
SEWER IMPACT FEE$1,619.00
WATER IMPACT FEE$426.00
RESIDENTIAL BUILDING PERMIT FEE$1,918.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$277.00
RESIDENTIAL FEE$148.53
MISCELLANOUS MECHANICAL FEES$152.50
MISCELLANEOUS BUILDING PERMIT FEES$15.00
SLAB 03/14/2018 JDR$30.00
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
UTILITIES INSPECTION 08/27/2018 NMN$80.00
ELECTRICAL FINAL 06/14/2018 TWC$30.00
FLATWORK 03/15/2018 WND$30.00
FLATWORK 03/16/2018 WND$30.00
Total Fees:$5,551.78
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  SLAB
______  FLATWORK
______  FLATWORK
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  CO/BUILDING FINAL
______  UTILITIES INSPECTION
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)