|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/8/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-00029
|
JOB ADDRESS: 16356 MOSS HAVEN LN FRISCO, TX |
DESC:
2902 AC, 3565 SF, SFR / 2 STORY |
|
OWNER:
LENNAR HOMES OF TEXAS LAND AND CONSTRUCT
IRVING TX 75063-8050
|
CONTRACTOR:
LENNAR HOMES
IRVING TX 75063
|
ISSUED DATE: 1/18/2018
APPLIED DATE:12/19/2017
EXPIRED DATE:3/5/2019
SITE APN:D684168
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 216518.22
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
PLUMBTOPOUT/MECHRGH 06/04/2018 ARG | $30.00 |
PLUMBTOPOUT/MECHRGH 06/05/2018 ARG | $30.00 |
PLUMBTOPOUT/MECHRGH 06/07/2018 ARG | $30.00 |
SLAB 04/09/2018 CCM | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,578.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $106.95 |
MISCELLANEOUS PLUMBING FEES | $235.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
SEWER IMPACT FEE | $10.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $2,113.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $1.20 |
2NDS/FRAMING 06/14/2018 GLQ | $30.00 |
ELECTRICAL FINAL 07/30/2018 GLQ | $30.00 |
UTILITIES INSPECTION 08/17/2018 NMN | $80.00 |
Total Fees: | $5,003.40 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|