|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/8/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B18-00028
|
JOB ADDRESS: 335 TIMBER CREEK LN FRISCO, TX |
DESC:
3564 AC, 4217 SF, SFR / 2 STORY |
|
OWNER:
MASTER DEVELOPERS-TCB2 LLC
PLANO TX 75093-4381
|
CONTRACTOR:
LENNAR HOMES
IRVING TX 75063
|
ISSUED DATE: 1/18/2018
APPLIED DATE:12/19/2017
EXPIRED DATE:3/11/2019
SITE APN:D684148
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 265910.04
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 02/08/2018 EXM | $80.00 |
SET 1 PD METER 02/09/2018 MXH | $80.00 |
2NDS/FRAMING 06/01/2018 CCM | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,823.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $126.51 |
MISCELLANEOUS PLUMBING FEES | $249.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $10.00 |
WATER IMPACT FEE | $2,113.00 |
CREDIT CARD FEE | $3.80 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $11.60 |
2NDS/FRAMING 06/06/2018 GLQ | $30.00 |
INSULATION 06/18/2018 GLQ | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 08/17/2018 NMN | $80.00 |
UTILITIES INSPECTION 08/21/2018 NMN | $80.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
SLAB 03/08/2018 WND | $30.00 |
Total Fees: | $5,975.56 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ T-POLE |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|