|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/3/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-12085
|
JOB ADDRESS: 13363 SPOKANE WAY FRISCO, TX 75035 |
DESC:
4993 AC, 6134 SF, SFR / 2 STORY |
|
OWNER:
BLUEBONNET BR DEVELOPMENT LLC
PLANO TX 75093-3839
|
CONTRACTOR:
TOLL BROTHERS INC
Frisco TX 75034
|
ISSUED DATE: 2/15/2018
APPLIED DATE:12/13/2017
EXPIRED DATE:3/12/2019
SITE APN:C2757071
STATUS:COMPLETED
|
|
APPLICANT:
TOLL BROTHERS INC
Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 372527.73
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
GAS RELEASE 08/09/2018 ARG | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,358.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $184.02 |
MISCELLANEOUS PLUMBING FEES | $291.00 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
PLUMBTOPOUT/MECHRGH 05/31/2018 DE | $30.00 |
FLATWORK 08/02/2018 DE | $30.00 |
SEWER IMPACT FEE | $1,619.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $1,855.00 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $3.20 |
2NDS/FRAMING 06/08/2018 JDR | $30.00 |
INSULATION 06/18/2018 JDR | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
UTILITIES INSPECTION 08/23/2018 NMN | $80.00 |
UTILITIES INSPECTION 09/04/2018 NMN | $80.00 |
Total Fees: | $7,331.47 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ LATH |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ UTILITIES INSPECTION |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|