Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/2/2018 PERMIT SUB-TYPE: SNEW PERMIT NO: B17-12076
JOB ADDRESS:
6680 TITUS LN
FRISCO, TX
DESC:   3272 AC, 3955 SF, SFR / 2 STORY
OWNER:
TOLL DALLAS TX LLC

GRAPEVINE TX 76051-7094

CONTRACTOR:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100
Frisco TX 75034
ISSUED DATE:
1/10/2018
APPLIED DATE:
12/18/2017
EXPIRED DATE:
1/20/2019
SITE APN:
D705343
STATUS:
COMPLETED
APPLICANT:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100
Frisco TX 75034
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
244123.92
FEE SUMMARY
INSPECTION SUMMARY
DRY WALL 05/03/2018 CK$30.00
RESIDENTIAL BUILDING PERMIT FEE$1,718.75
FENCE FEE$20.00
RESIDENTIAL FEE$118.65
MISCELLANEOUS PLUMBING FEES$256.00
MISCELLANOUS MECHANICAL FEES$146.00
SEWER IMPACT FEE$0.00
THOROUGHFARE IMPACT FEE$3,816.00
WATER IMPACT FEE$1,772.00
CREDIT CARD FEE$2.40
CREDIT CARD FEE$1.80
CO/BUILDING FINAL 07/20/2018 JDR$30.00
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
DRY WALL 04/30/2018 VCS$30.00
FLATWORK 05/18/2018 VCS$30.00
ELECTRICAL FINAL 06/04/2018 VCS$30.00
PLUMBTOPOUT/MECHRGH 03/30/2018 MLM$30.00
PLUMBTOPOUT/MECHRGH 03/28/2018 MLM$30.00
Total Fees:$8,596.60
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  LATH
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)