|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/2/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-12076
|
JOB ADDRESS: 6680 TITUS LN FRISCO, TX |
DESC:
3272 AC, 3955 SF, SFR / 2 STORY |
|
OWNER:
TOLL DALLAS TX LLC
GRAPEVINE TX 76051-7094
|
CONTRACTOR:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100 Frisco TX 75034
|
ISSUED DATE: 1/10/2018
APPLIED DATE:12/18/2017
EXPIRED DATE:1/20/2019
SITE APN:D705343
STATUS:COMPLETED
|
|
APPLICANT:
TOLL BROTHERS INC
2557 SW GRAPEVINE PARKWAY #100 Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 244123.92
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
DRY WALL 05/03/2018 CK | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,718.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $118.65 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
SEWER IMPACT FEE | $0.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.80 |
CO/BUILDING FINAL 07/20/2018 JDR | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
DRY WALL 04/30/2018 VCS | $30.00 |
FLATWORK 05/18/2018 VCS | $30.00 |
ELECTRICAL FINAL 06/04/2018 VCS | $30.00 |
PLUMBTOPOUT/MECHRGH 03/30/2018 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 03/28/2018 MLM | $30.00 |
Total Fees: | $8,596.60 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ LATH |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|