|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/5/2018
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-12051
|
JOB ADDRESS: 8043 RESERVOIR DR FRISCO, TX |
DESC:
1836 AC 2560 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES OF TEXAS LP
IRVING TX 75063-2439
|
CONTRACTOR:
PULTE HOMES
IRVING TX 75063
|
ISSUED DATE: 1/16/2018
APPLIED DATE:12/20/2017
EXPIRED DATE:11/11/2018
SITE APN:D684039
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 136685.52
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
UTILITIES INSPECTION 04/17/2018 CB | $80.00 |
UTILITIES INSPECTION 05/09/2018 CB | $80.00 |
UTILITIES INSPECTION 05/10/2018 CB | $80.00 |
DRY WALL 03/12/2018 DE | $30.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $26.00 |
WATER IMPACT FEE | $1,493.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $4.80 |
CREDIT CARD FEE | $3.20 |
BRICK/WALL TIES 03/20/2018 EW | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $1,178.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $76.80 |
MISCELLANEOUS PLUMBING FEES | $191.00 |
MISCELLANOUS MECHANICAL FEES | $106.50 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
PLUMBTOPOUT/MECHRGH 02/26/2018 MLM | $30.00 |
UTILITIES INSPECTION 04/25/2018 CB | $80.00 |
UTILITIES INSPECTION 05/01/2018 CB | $80.00 |
2NDS/FRAMING 03/01/2018 DE | $30.00 |
Total Fees: | $4,157.45 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ T-POLE |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|