|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/26/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-12001
|
JOB ADDRESS: 1943 ALCOVE DR FRISCO, TX |
DESC:
5260 AC, 6136 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES 2014 LP
ADDISON TX 75001-6772
|
CONTRACTOR:
GRAND HOMES
ADDISON TX 75001
|
ISSUED DATE: 1/9/2018
APPLIED DATE:12/7/2017
EXPIRED DATE:1/15/2019
SITE APN:D677563
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 392448.6
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
SET 1 PD METER 01/10/2018 MXH | $80.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,458.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $184.04 |
MISCELLANEOUS PLUMBING FEES | $333.00 |
MISCELLANOUS MECHANICAL FEES | $165.50 |
INSULATION 04/04/2018 JWF | $30.00 |
INSULATION 04/09/2018 JWF | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
UTILITIES INSPECTION 06/25/2018 NMN | $80.00 |
UTILITIES INSPECTION 07/02/2018 NMN | $80.00 |
SEWER IMPACT FEE | $1,619.00 |
WATER IMPACT FEE | $1,772.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
Total Fees: | $11,703.29 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ LATH |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ SWROWINSP |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|