Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/29/2017 PERMIT SUB-TYPE: SNEW PERMIT NO: B17-11972
JOB ADDRESS:
8921 SHORE CREST RD
FRISCO, TX
DESC:   1472 AC, 2250 SF, SFR / 1 STORY
OWNER:
PULTE HOMES

IRVING TX 75063

CONTRACTOR:
PULTE HOMES

IRVING TX 75063
ISSUED DATE:
1/9/2018
APPLIED DATE:
12/6/2017
EXPIRED DATE:
10/28/2018
SITE APN:
STATUS:
COMPLETED
APPLICANT:
PULTE HOMES

IRVING TX 75063
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
109825.92
FEE SUMMARY
INSPECTION SUMMARY
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
RESIDENTIAL BUILDING PERMIT FEE$1,043.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$191.00
MISCELLANOUS MECHANICAL FEES$106.50
RESIDENTIAL FEE$67.50
CREDIT CARD FEE$0.60
CREDIT CARD FEE$1.20
ELECTRICAL FINAL 04/03/2018 EW$30.00
ELECTRICAL FINAL 04/04/2018 EW$30.00
PLUMBING ROUGH-IN 01/15/2018 JWF$30.00
WATER IMPACT FEE$1,252.00
Total Fees:$3,307.55
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  DRY WALL
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  FLATWORK
______  ELECTRICAL FINAL
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)