BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/17/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-11822
|
JOB ADDRESS: 4251 KATMAI DR FRISCO, TX |
DESC:
4370 AC, 5446 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 1/4/2018
APPLIED DATE:12/7/2017
EXPIRED DATE:3/12/2019
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 326045.7
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
2NDS/FRAMING 04/30/2018 CCM | $30.00 |
SEWER IMPACT FEE | $1,888.00 |
THOROUGHFARE IMPACT FEE | $4,597.00 |
WATER IMPACT FEE | $2,737.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,128.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $163.38 |
MISCELLANEOUS PLUMBING FEES | $315.00 |
MISCELLANOUS MECHANICAL FEES | $192.00 |
PLUMBING ROUGH-IN 02/02/2018 JWF | $30.00 |
CREDIT CARD FEE | $7.70 |
UTILITIES INSPECTION 09/05/2018 NMN | $80.00 |
REPLACE READABLE REGISTER | $275.00 |
SLAB 02/15/2018 WND | $30.00 |
ELECTRICAL FINAL 07/25/2018 WND | $30.00 |
Total Fees: | $13,058.83 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ T-POLE |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ SHEATHING |
______ 2NDS/FRAMING |
______ LATH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|