|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/8/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-11413
|
JOB ADDRESS: 14773 MEDITERRANEAN DR FRISCO, TX 75035 |
DESC:
4144 AC,4854 SF, SFR / 2 STORY |
|
OWNER:
LENNAR HOMES OF TEXAS LAND AND CONSTRUCT
IRVING TX 75063-5063
|
CONTRACTOR:
LENNAR HOMES
IRVING TX 75063
|
ISSUED DATE: 12/27/2017
APPLIED DATE:11/15/2017
EXPIRED DATE:3/12/2019
SITE APN:C2723704
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 309183.84
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
SET 1 PD METER 01/16/2018 PXF | $80.00 |
ELECTRICAL FINAL 07/10/2018 CCM | $30.00 |
RESIDENTIAL BUILDING PERMIT FEE | $2,043.75 |
FENCE FEE | $20.00 |
RESIDENTIAL FEE | $145.62 |
MISCELLANEOUS PLUMBING FEES | $291.00 |
MISCELLANOUS MECHANICAL FEES | $165.50 |
PLUMBTOPOUT/MECHRGH 04/24/2018 DE | $30.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
SEWER IMPACT FEE | $0.00 |
WATER IMPACT FEE | $1,772.00 |
CREDIT CARD FEE | $2.80 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $12.20 |
SLAB 02/09/2018 JDR | $30.00 |
2NDS/FRAMING 05/08/2018 JDR | $30.00 |
UTILITIES INSPECTION 08/17/2018 NMN | $80.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
2NDS/FRAMING 05/03/2018 WND | $30.00 |
2NDS/FRAMING 05/07/2018 WND | $30.00 |
Total Fees: | $9,109.67 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|