Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/16/2017 PERMIT SUB-TYPE: SNEW PERMIT NO: B17-11171
JOB ADDRESS:
220 BUCK RIDGE DR
FRISCO, TX 75068
DESC:   2091 AC, 2602 SF, SFR / 2 STORY
OWNER:
DOE CREEK VENTURES LLC

DENTON TX 76207-3441

CONTRACTOR:
DOE CREEK VENTURES, LLC

DENTON TX 76207
ISSUED DATE:
11/17/2017
APPLIED DATE:
10/13/2017
EXPIRED DATE:
4/7/2020
SITE APN:
D43520
STATUS:
COMPLETED
APPLICANT:
DOE CREEK VENTURES, LLC

DENTON TX 76207
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
156009.51
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$125.00
1 INCH PD METER$410.00
FIRE DEPT INSPECTION FEES$78.06
PLUMBTOPOUT/MECHRGH 04/25/2018 ARG$30.00
2NDS/FRAMING 10/29/2018 ARG$30.00
SET 1 PD METER 11/27/2017 PXF$80.00
SHEATHING 05/29/2018 CCM$30.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$0.60
CREDIT CARD FEE$1.80
SHEATHING 06/14/2018 GLQ$30.00
BUILDING PERMIT FEE$1,278.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$212.00
MISCELLANOUS MECHANICAL FEES$113.00
RESIDENTIAL FEE (E)$78.06
SLAB 01/09/2018 JDR$30.00
SLAB 01/10/2018 JDR$30.00
ELECTRICAL FINAL 05/08/2019 JDW2$30.00
ELECTRICAL FINAL 05/10/2019 JDW2$30.00
UTILITIES INSPECTION 08/21/2019 NMN$90.00
THOROUGHFARE IMPACT FEE$2,735.00
WATER IMPACT FEE$1,836.00
SEWER IMPACT FEE$1,619.00
DRY WALL 12/28/2018 TWC$30.00
2NDS/FRAMING 09/18/2018 VCS$30.00
Total Fees:$8,977.87
______  METER PAYMENT
______  SET 1 PD METER
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  AUTOFIRE SPRK HYDRO
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  SHEATHING
______  ELECTRICAL ROUGH IN
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  DRY WALL
______  LATH
______  LATH
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  GAS RELEASE
______  FLATWORK
______  PLUMBING FINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  CO AND BUILDING FINAL
______  CO AND BUILDING FINAL
______  CO AND BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)