Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 11/6/2017 PERMIT SUB-TYPE: SNEW PERMIT NO: B17-10733
JOB ADDRESS:
2105 IPSWICH LN
FRISCO, TX
DESC:   3762 AC, 4703 SF, SFR / 2 STORY
OWNER:
CALATLANTIC HOMES

IRVING TX 75039

CONTRACTOR:
CALATLANTIC HOMES

IRVING TX 75039
ISSUED DATE:
11/17/2017
APPLIED DATE:
10/11/2017
EXPIRED DATE:
4/17/2019
SITE APN:
D702066
STATUS:
COMPLETED
APPLICANT:
CALATLANTIC HOMES

IRVING TX 75039
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
280682.82
FEE SUMMARY
INSPECTION SUMMARY
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
PLUMBTOPOUT/MECHRGH 03/16/2018 CK$30.00
THOROUGHFARE IMPACT FEE$3,816.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$0.00
CREDIT CARD FEE$2.40
CREDIT CARD FEE$0.60
CREDIT CARD FEE$11.60
CREDIT CARD FEE$3.20
CREDIT CARD FEE$1.60
ELECTRICAL FINAL 08/21/2018 GLQ$30.00
BUILDING PERMIT FEE$1,898.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$256.00
MISCELLANOUS MECHANICAL FEES$146.00
RESIDENTIAL FEE (E)$141.09
2NDS/FRAMING 04/05/2018 MC$30.00
2NDS/FRAMING 04/12/2018 MC$30.00
2NDS/FRAMING 06/07/2018 MC$30.00
1 INCH PD METER$410.00
WATER METER DEPOSIT$125.00
UTILITIES INSPECTION 09/26/2018 NMN$80.00
UTILITIES INSPECTION 10/02/2018 NMN$80.00
UTILITIES INSPECTION 10/05/2018 NMN$80.00
PLUMBING ROUGH-IN 01/15/2018 SDC$30.00
UTILITIES INSPECTION FAILED$80.00
INSULATION 06/14/2018 WND$30.00
INSULATION 06/15/2018 WND$30.00
Total Fees:$9,664.24
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  INSULATION
______  INSULATION
______  INSULATION
______  2NDS/FRAMING
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)