BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/2/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-10646
|
JOB ADDRESS: 4029 COTTON GIN RD FRISCO, TX |
DESC:
*MODEL*2020 AC, 2693 SF, SFR / 2 STORY |
|
OWNER:
CB JENI HOMES
8095 Canal Street Frisco TX 75034
|
CONTRACTOR:
CB JENI HOMES
8095 Canal Street Frisco TX 75034
|
ISSUED DATE: 11/21/2017
APPLIED DATE:10/20/2017
EXPIRED DATE:12/8/2018
SITE APN:D707426
STATUS:COMPLETED
|
|
APPLICANT:
CB JENI HOMES
8095 Canal Street Frisco TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 150712.2
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 11/28/2017 PXF | $80.00 |
SET 1 PD METER 12/11/2017 EXM | $80.00 |
SET 1 PD METER 01/10/2018 JPY | $80.00 |
SET 1 PD METER 01/23/2018 JPY | $80.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $1.60 |
BUILDING PERMIT FEE | $1,248.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $205.00 |
MISCELLANOUS MECHANICAL FEES | $113.00 |
RESIDENTIAL FEE (E) | $80.79 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
FIRE DEPT INSPECTION FEES | $80.79 |
SHEATHING 01/15/2018 WND | $30.00 |
2NDS/FRAMING 01/29/2018 WND | $30.00 |
Total Fees: | $2,669.73 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SET 1 PD METER |
______ SHEATHING |
______ SET 1 PD METER |
______ SHEATHING |
______ SHEATHING |
______ SET 1 PD METER |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ SET 1 PD METER |
______ AUTOFIRE SPRK HYDRO |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|