|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/13/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-10006
|
JOB ADDRESS: 10549 ALVISO RD FRISCO, TX |
DESC:
4097 AC, 5068 SF, SFR / 2 STORY |
|
OWNER:
DUNHILL HOMES DFW LLC
4835 LBJ FWY STE 700 DALLAS TX 75244
|
CONTRACTOR:
DUNHILL HOMES DFW LLC
4835 LBJ FWY STE 700 DALLAS TX 75244
|
ISSUED DATE: 10/19/2017
APPLIED DATE:9/27/2017
EXPIRED DATE:12/29/2018
SITE APN:C2757343
STATUS:COMPLETED
|
|
APPLICANT:
DUNHILL HOMES DFW LLC
4835 LBJ FWY STE 700 DALLAS TX 75244
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 305677.17
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB 11/21/2017 CCM | $30.00 |
BUILDING PERMIT FEE | $2,023.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
RESIDENTIAL FEE (E) | $152.04 |
GAS RELEASE 04/30/2018 DE | $30.00 |
SEWER IMPACT FEE | $805.00 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $10.60 |
CREDIT CARD FEE | $2.80 |
2NDS/FRAMING 02/07/2018 JDR | $30.00 |
2NDS/FRAMING 02/21/2018 JDR | $30.00 |
2NDS/FRAMING 02/22/2018 JDR | $30.00 |
ELECTRICAL FINAL 04/25/2018 JDSM | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
UTILITIES INSPECTION 05/24/2018 NMN | $80.00 |
Total Fees: | $4,713.49 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBING ROUGH-IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBING ROUGH-IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ WATER REGISTER |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ 2NDS/FRAMING |
______ PLUMBMECHFINAL |
______ TREE |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|