Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/28/2017 PERMIT SUB-TYPE: SNEW PERMIT NO: B17-08905
JOB ADDRESS:
731 BANNERDALE BLVD
FRISCO, TX
DESC:   3374 AC, 4182 SF, SFR / 2 STORY
OWNER:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway
Houston TX 77017

CONTRACTOR:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway
Houston TX 77017
ISSUED DATE:
9/29/2017
APPLIED DATE:
9/8/2017
EXPIRED DATE:
10/28/2018
SITE APN:
D695502
STATUS:
COMPLETED
APPLICANT:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway
Houston TX 77017
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
251734.14
FEE SUMMARY
INSPECTION SUMMARY
2NDS/FRAMING 01/26/2018 CCM$30.00
2NDS/FRAMING 01/31/2018 CCM$30.00
GAS RELEASE 04/03/2018 CI$30.00
THOROUGHFARE IMPACT FEE$3,816.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
CREDIT CARD FEE$2.40
CREDIT CARD FEE$1.20
CREDIT CARD FEE$2.40
FLATWORK 03/20/2018 GLQ$30.00
ELECTRICAL FINAL 03/28/2018 GLQ$30.00
BUILDING PERMIT FEE$1,753.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$221.00
MISCELLANOUS MECHANICAL FEES$139.50
RESIDENTIAL BUILDING (E) FEE$125.46
SLAB 11/02/2017 JDR$30.00
DRY WALL 02/22/2018 JDR$30.00
WATER METER DEPOSIT$125.00
1 INCH PD METER$410.00
GAS RELEASE 03/30/2018 MLM$30.00
PLUMBTOPOUT/MECHRGH 01/09/2018 SDC$30.00
DRY WALL 02/20/2018 TWC$30.00
Total Fees:$6,916.71
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB
______  SLAB
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)