|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/20/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-08422
|
JOB ADDRESS: 15128 CAMDEN LN FRISCO, TX 75035 |
DESC:
4429 AC, 5308 SF, SFR / 2 STORY |
|
OWNER:
LENNAR HOMES
IRVING TX 75063
|
CONTRACTOR:
LENNAR HOMES
IRVING TX 75063
|
ISSUED DATE: 11/2/2017
APPLIED DATE:10/3/2017
EXPIRED DATE:12/10/2018
SITE APN:C2645160
STATUS:COMPLETED
|
|
APPLICANT:
LENNAR HOMES
IRVING TX 75063
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 330447.69
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 01/26/2018 ARG | $30.00 |
PLUMBTOPOUT/MECHRGH 01/16/2018 CI | $30.00 |
PLUMBTOPOUT/MECHRGH 01/19/2018 CI | $30.00 |
PLUMBTOPOUT/MECHRGH 01/22/2018 CI | $30.00 |
BUILDING PERMIT FEE | $2,148.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $277.00 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
RESIDENTIAL FEE (E) | $159.24 |
WATER IMPACT FEE | $1,911.00 |
SEWER IMPACT FEE | $1,553.00 |
THOROUGHFARE IMPACT FEE | $4,001.00 |
CREDIT CARD FEE | $4.00 |
CREDIT CARD FEE | $3.20 |
SLAB 11/27/2017 EW | $30.00 |
DRY WALL 02/14/2018 JDR | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
PLUMBING ROUGH-IN 11/10/2017 SDC | $30.00 |
PLUMBING ROUGH-IN 11/13/2017 SDC | $30.00 |
2NDS/FRAMING 01/31/2018 TWC | $30.00 |
UTILITIES INSPECTION 05/31/2018 NMN | $80.00 |
UTILITIES INSPECTION 05/24/2018 NMN | $80.00 |
CREDIT CARD FEE | $2.40 |
PLAN REVIEW FEE | $50.00 |
Total Fees: | $11,247.09 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|