|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/14/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-08261
|
JOB ADDRESS: 9728 STRATTON DR FRISCO, TX 75035 |
DESC:
3339 AC, 3970 SF, SFR / 2 STORY |
|
OWNER:
CALATLANTIC HOMES
IRVING TX 75039
|
CONTRACTOR:
CALATLANTIC HOMES
IRVING TX 75039
|
ISSUED DATE: 9/20/2017
APPLIED DATE:8/11/2017
EXPIRED DATE:1/23/2019
SITE APN:C2741125
STATUS:COMPLETED
|
|
APPLICANT:
CALATLANTIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 249122.79
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH-IN 11/02/2017 CI | $30.00 |
BUILDING PERMIT FEE | $1,743.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $119.10 |
GAS RELEASE 05/15/2018 DE | $30.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $2.20 |
2NDS/FRAMING 02/16/2018 EW | $30.00 |
2NDS/FRAMING 02/12/2018 JDR | $30.00 |
2NDS/FRAMING 03/12/2018 JDR | $30.00 |
BRICK/WALL TIES 03/27/2018 JDR | $30.00 |
PLUMBTOPOUT/MECHRGH 02/06/2018 JWF | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
UTILITIES INSPECTION 06/22/2018 NMN | $80.00 |
ELECTRICAL FINAL 05/10/2018 WND | $30.00 |
Total Fees: | $4,775.05 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SHEATHING |
______ PLUMBMECHFINAL |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ LATH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ TREE |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ FLATWORK |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|