|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/9/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-07052
|
JOB ADDRESS: 15098 CRYSTAL BEACH LN FRISCO, TX 75035 |
DESC:
4901AC, 6082 SF, SFR / 2 STORY |
|
OWNER:
SHADDOCK HOMES LTD
PLANO TX 75093-4399
|
CONTRACTOR:
SHADDOCK HOMES LTD
PLANO TX 75093
|
ISSUED DATE: 8/10/2017
APPLIED DATE:7/19/2017
EXPIRED DATE:7/30/2018
SITE APN:C2704871
STATUS:COMPLETED
|
|
APPLICANT:
SHADDOCK HOMES LTD
PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 365663.61
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 12/14/2017 ARG | $30.00 |
ELECTRICAL FINAL 12/15/2017 ARG | $30.00 |
SET 1 PD METER 08/11/2017 DAX | $80.00 |
SET 1 PD METER 08/16/2017 DAX | $80.00 |
UTILITIES INSPECTION 12/20/2017 CB | $80.00 |
PLUMBMECHFINAL 01/09/2018 CI | $30.00 |
BUILDING PERMIT FEE | $2,323.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS ELECTRICAL FEES | $182.46 |
MISCELLANEOUS PLUMBING FEES | $312.00 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
INSULATION 11/07/2017 DE | $30.00 |
THOROUGHFARE IMPACT FEE | $1,975.00 |
WATER IMPACT FEE | $523.00 |
SEWER IMPACT FEE | $388.00 |
CREDIT CARD FEE | $3.20 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.20 |
CREDIT CARD FEE | $0.60 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
PLUMBING ROUGH-IN 08/22/2017 MLM | $30.00 |
PLUMBMECHFINAL 01/29/2018 SDC | $30.00 |
Total Fees: | $6,840.11 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|