|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/26/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-06521
|
JOB ADDRESS: 15500 CADEMAN CT FRISCO, TX 75035 |
DESC:
3723 AC , 4570 SF, SFR / 2 STORY |
|
OWNER:
MEGATEL HOMES INC
FARMERS BRANCH TX 75234
|
CONTRACTOR:
MEGATEL HOMES INC
FARMERS BRANCH TX 75234
|
ISSUED DATE: 7/28/2017
APPLIED DATE:7/11/2017
EXPIRED DATE:12/24/2018
SITE APN:C2741102
STATUS:COMPLETED
|
|
APPLICANT:
MEGATEL HOMES INC
FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 277773.03
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
SLAB 08/24/2017 ARG | $30.00 |
PLUMBTOPOUT/MECHRGH 11/22/2017 CI | $30.00 |
PLUMBTOPOUT/MECHRGH 11/29/2017 CI | $30.00 |
SEWER IMPACT FEE | $1,619.00 |
BUILDING PERMIT FEE | $1,883.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $277.00 |
MISCELLANOUS MECHANICAL FEES | $152.50 |
RESIDENTIAL ELECTRIC FEE | $137.10 |
ELECTRICAL FINAL 03/07/2018 JDR | $30.00 |
PLUMBMECHFINAL 03/27/2018 JWF | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
UTILITIES INSPECTION 04/09/2018 CB | $80.00 |
PLUMBING ROUGH-IN 08/04/2017 SDC | $30.00 |
Total Fees: | $5,384.35 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBING ROUGH-IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|