|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/27/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-06490
|
JOB ADDRESS: 611 BANNERDALE BLVD FRISCO, TX |
DESC:
3467 AC, 4146 SF, SFR / 2 STORY |
|
OWNER:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway Houston TX 77017
|
CONTRACTOR:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway Houston TX 77017
|
ISSUED DATE: 7/28/2017
APPLIED DATE:7/12/2017
EXPIRED DATE:9/4/2018
SITE APN:D695497
STATUS:COMPLETED
|
|
APPLICANT:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway Houston TX 77017
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 258672.87
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
DRY WALL 12/11/2017 CCM | $30.00 |
ELECTRICAL FINAL 02/01/2018 CCM | $30.00 |
PLUMBTOPOUT/MECHRGH 10/24/2017 CI | $30.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
BUILDING PERMIT FEE | $1,788.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $242.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $124.38 |
CREDIT CARD FEE | $2.80 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $11.20 |
CREDIT CARD FEE | $1.20 |
SLAB 09/14/2017 JDR | $80.00 |
SLAB 09/15/2017 JDR | $30.00 |
2NDS/FRAMING 11/17/2017 JDR | $30.00 |
2NDS/FRAMING 11/28/2017 JDR | $30.00 |
PLUMBING ROUGH-IN 08/22/2017 JFS | $30.00 |
PLUMBING ROUGH-IN 08/28/2017 JFS | $30.00 |
PLUMBTOPOUT/MECHRGH 10/27/2017 JWF | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
ELECTRICAL FINAL 02/06/2018 TWC | $30.00 |
Total Fees: | $10,960.73 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|