|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/30/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-05729
|
JOB ADDRESS: 1330 BONNEVILLE RD FRISCO, TX |
DESC:
4008 AC, 4968 SF, SFR / 2 STORY |
|
OWNER:
CALATLANTIC HOMES
IRVING TX 75039
|
CONTRACTOR:
CALATLANTIC HOMES
IRVING TX 75039
|
ISSUED DATE: 7/17/2017
APPLIED DATE:6/15/2017
EXPIRED DATE:11/20/2018
SITE APN:D677655
STATUS:COMPLETED
|
|
APPLICANT:
CALATLANTIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 299036.88
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 07/27/2017 JPY | $80.00 |
UTILITIES INSPECTION 03/27/2018 CB | $80.00 |
UTILITIES INSPECTION 03/29/2018 CB | $80.00 |
UTILITIES INSPECTION 05/11/2018 CB | $80.00 |
PLUMBMECHFINAL 05/16/2018 CI | $30.00 |
BUILDING PERMIT FEE | $1,993.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $149.04 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $0.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $3.20 |
CREDIT CARD FEE | $7.10 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $0.60 |
INSULATION 11/29/2017 JDR | $30.00 |
PLUMBING ROUGH-IN 08/04/2017 JFS | $30.00 |
PLUMBING ROUGH-IN 08/07/2017 JFS | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
REPLACE READABLE REGISTER | $275.00 |
UTILITIES INSPECTION 05/02/2018 CB | $80.00 |
2NDS/FRAMING 11/14/2017 REED | $30.00 |
Total Fees: | $9,540.49 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|