BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/30/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-05360
|
JOB ADDRESS: 3112 IMPALA TRL FRISCO, TX |
DESC:
3712 AC, 4418 SF, SFR / 2 STORY |
|
OWNER:
MERITAGE HOMES
DALLAS TX 75019
|
CONTRACTOR:
MERITAGE HOMES
DALLAS TX 75019
|
ISSUED DATE: 7/10/2017
APPLIED DATE:6/14/2017
EXPIRED DATE:6/26/2018
SITE APN:D655160
STATUS:COMPLETED
|
|
APPLICANT:
MERITAGE HOMES
DALLAS TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 276952.32
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 07/11/2017 JPY | $80.00 |
UTILITIES INSPECTION 12/15/2017 CB | $80.00 |
UTILITIES INSPECTION 12/19/2017 CB | $80.00 |
2NDS/FRAMING 10/11/2017 CCM | $30.00 |
2NDS/FRAMING 10/16/2017 CCM | $30.00 |
2NDS/FRAMING 10/18/2017 CCM | $30.00 |
ELECTRICAL FINAL 11/22/2017 CCM | $30.00 |
BUILDING PERMIT FEE | $1,878.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
RESIDENTIAL ELECTRIC FEE | $132.54 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
GAS RELEASE 11/29/2017 GU | $30.00 |
PLUMBING ROUGH-IN 07/21/2017 JWF | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
SET 1 PD METER 07/11/2017 JPY | $80.00 |
T-POLE 07/13/2017 WND | $30.00 |
Total Fees: | $10,705.79 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|