|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/27/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-05134
|
JOB ADDRESS: 12022 BROWNWOOD DR FRISCO, TX 75035 |
DESC:
3124 AC, 3628 SF, SFR / 2 STORY |
|
OWNER:
SUMEER HOMES INC
IRVING TX 75062-7075
|
CONTRACTOR:
SUMEER HOMES
2404 Texas drive IRVING TX 75062
|
ISSUED DATE: 7/11/2017
APPLIED DATE:6/8/2017
EXPIRED DATE:6/15/2019
SITE APN:C2520160
STATUS:COMPLETED
|
|
APPLICANT:
SUMEER HOMES
2404 Texas drive IRVING TX 75062
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 263224.08
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB 07/25/2017 ARG | $30.00 |
PLUMBTOPOUT/MECHRGH 11/17/2017 CI | $30.00 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $235.00 |
MISCELLANOUS MECHANICAL FEES | $133.00 |
RESIDENTIAL ELECTRIC FEE | $109.44 |
BUILDING PERMIT FEE | $1,813.75 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.80 |
CREDIT CARD FEE | $0.60 |
2NDS/FRAMING 12/11/2017 JWE2 | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
2NDS/FRAMING 11/30/2017 REED | $30.00 |
ELECTRICAL FINAL 04/17/2018 WND | $30.00 |
Total Fees: | $3,009.39 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|