Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/27/2017 PERMIT SUB-TYPE: SNEW PERMIT NO: B17-05133
JOB ADDRESS:
12054 BIG SPRINGS DR
FRISCO, TX 75035
DESC:   3202 AC, 3742 SF, SFR / 2 STORY
OWNER:
SUMEER HOMES INC

IRVING TX 75062-7075

CONTRACTOR:
SUMEER HOMES
2404 Texas drive
IRVING TX 75062
ISSUED DATE:
7/11/2017
APPLIED DATE:
6/8/2017
EXPIRED DATE:
2/26/2019
SITE APN:
C2520133
STATUS:
COMPLETED
APPLICANT:
SUMEER HOMES
2404 Texas drive
IRVING TX 75062
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
270088.2
FEE SUMMARY
INSPECTION SUMMARY
SLAB 07/25/2017 ARG$30.00
PLUMBMECHFINAL 07/02/2018 ARG$30.00
PLUMBTOPOUT/MECHRGH 09/27/2017 CI$30.00
PLUMBTOPOUT/MECHRGH 09/28/2017 CI$30.00
PLUMBTOPOUT/MECHRGH 09/28/2017 CI$30.00
PLUMBTOPOUT/MECHRGH 10/05/2017 CI$30.00
PLUMBTOPOUT/MECHRGH 10/11/2017 CI$30.00
FENCE FEE$20.00
RESIDENTIAL ELECTRIC FEE$112.26
BUILDING PERMIT FEE$1,848.75
MISCELLANEOUS PLUMBING FEES$235.00
MISCELLANOUS MECHANICAL FEES$133.00
CREDIT CARD FEE$1.20
CREDIT CARD FEE$3.00
CREDIT CARD FEE$1.20
CREDIT CARD FEE$0.80
CREDIT CARD FEE$13.20
CREDIT CARD FEE$14.80
CREDIT CARD FEE$0.60
ELECTRICAL FINAL 03/16/2018 JDR$30.00
PLUMBING ROUGH-IN 07/18/2017 JFS$30.00
REPLACEMENT CARD FEE$10.00
WATER METER DEPOSIT$125.00
1 INCH PD METER$410.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
UTILITIES INSPECTION 04/26/2018 CB$80.00
UTILITIES INSPECTION 04/26/2018 CB$80.00
UTILITIES INSPECTION 05/18/2018 NMN$80.00
UTILITIES INSPECTION 05/29/2018 NMN$80.00
UTILITIES INSPECTION 06/04/2018 NMN$80.00
2NDS/FRAMING 10/18/2017 REED$30.00
2NDS/FRAMING 10/24/2017 REED$30.00
Total Fees:$4,658.81
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  2NDS/FRAMING
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  GAS RELEASE
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  WATER REGISTER
______  UTILITIES INSPECTION
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)