|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/30/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-04628
|
JOB ADDRESS: 2295 TUMBLEGRASS RD FRISCO, TX |
DESC:
3371 AC, 4289 SF, SFR / 2 STORY |
|
OWNER:
WEEKLEY HOMES CORPORATE OFFICES
1111 N POST OAK RD HOUSTON TX 75007
|
CONTRACTOR:
WEEKLEY HOMES CORPORATE OFFICES
1111 N POST OAK RD HOUSTON TX 75007
|
ISSUED DATE: 7/5/2017
APPLIED DATE:5/23/2017
EXPIRED DATE:6/25/2018
SITE APN:D695896
STATUS:COMPLETED
|
|
APPLICANT:
WEEKLEY HOMES CORPORATE OFFICES
1111 N POST OAK RD HOUSTON TX 75007
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 251510.31
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
SET 1 PD METER 07/06/2017 BS | $80.00 |
SET 1 PD METER 07/12/2017 LHG | $80.00 |
UTILITIES INSPECTION 12/18/2017 CB | $80.00 |
UTILITIES INSPECTION 12/18/2017 CB | $80.00 |
BUILDING PERMIT FEE | $1,753.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $128.67 |
WATER IMPACT FEE | $426.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $3.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $13.20 |
2NDS/FRAMING 09/15/2017 GLQ | $30.00 |
ELECTRICAL FINAL 11/15/2017 GLQ | $30.00 |
ELECTRICAL FINAL 11/22/2017 GLQ | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLUMBTOPOUT/MECHRGH 09/11/2017 JFS | $30.00 |
PLUMBTOPOUT/MECHRGH 09/13/2017 JFS | $30.00 |
CREDIT CARD FEE | $87.99 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
CREDIT CARD FEE | $10.70 |
SLAB 07/31/2017 REED | $30.00 |
INSULATION 09/28/2017 REED | $30.00 |
Total Fees: | $6,083.71 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ FLATWORK |
______ SLAB |
______ T-POLE |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ SHEATHING |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ MECHANICAL FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|