|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/15/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-04091
|
JOB ADDRESS: 13209 COOL MEADOW DR FRISCO, TX 75035 |
DESC:
3935 AC, 4763 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS CUSTOM HOMES
DALLAS TX 75201
|
CONTRACTOR:
FIRST TEXAS CUSTOM HOMES
DALLAS TX 75201
|
ISSUED DATE: 6/19/2017
APPLIED DATE:5/31/2017
EXPIRED DATE:8/14/2018
SITE APN:ADD94240
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS CUSTOM HOMES
DALLAS TX 75201
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 293590.35
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB 07/11/2017 ARG | $30.00 |
UTILITIES INSPECTION 02/07/2018 CB | $80.00 |
SLAB 07/10/2017 CCM | $30.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
BUILDING PERMIT FEE | $1,963.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $249.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $142.89 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $7.70 |
CREDIT CARD FEE | $0.60 |
T-POLE 06/27/2017 EW | $30.00 |
PLUMBMECHFINAL 02/06/2018 JWF | $30.00 |
PLUMBMECHFINAL 02/13/2018 JWF | $30.00 |
INSULATION 09/08/2017 MC | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
REPLACE READABLE REGISTER | $275.00 |
INSULATION 09/13/2017 REED | $30.00 |
FLATWORK 11/13/2017 REED | $30.00 |
FLATWORK 11/14/2017 REED | $30.00 |
PLUMBING ROUGH-IN 07/05/2017 SDC | $30.00 |
PLUMBTOPOUT/MECHRGH 08/15/2017 SDC | $30.00 |
PLUMBTOPOUT/MECHRGH 08/28/2017 SDC | $30.00 |
Total Fees: | $10,456.94 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|