BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/15/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-04086
|
JOB ADDRESS: 13765 CLUSTERBERRY DR FRISCO, TX 75035 |
DESC:
3874 AC, 4607 SF, SFR / 2 STORY |
|
OWNER:
GEHAN HOMES LTD
15725 North Dallas Pkwy ste 300 FRISCO TX 75035
|
CONTRACTOR:
GEHAN HOMES LTD
15725 North Dallas Pkwy ste 300 FRISCO TX 75035
|
ISSUED DATE: 6/22/2017
APPLIED DATE:5/31/2017
EXPIRED DATE:6/11/2018
SITE APN:C2707384
STATUS:COMPLETED
|
|
APPLICANT:
GEHAN HOMES LTD
15725 North Dallas Pkwy ste 300 FRISCO TX 75035
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 289039.14
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
UTILITIES INSPECTION 12/06/2017 CB | $80.00 |
UTILITIES INSPECTION 12/11/2017 CB | $80.00 |
PLUMBMECHFINAL 12/05/2017 CI | $30.00 |
PLUMBMECHFINAL 12/07/2017 CK | $10.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
BUILDING PERMIT FEE | $1,943.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $138.21 |
PLAN REVIEW FEE | $50.00 |
ELECTRICAL FINAL 11/22/2017 DE | $30.00 |
PLUMBMECHFINAL 12/07/2017 CK | $20.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
DRY WALL 10/11/2017 EW | $30.00 |
ELECTRICAL FINAL 11/15/2017 EW | $30.00 |
ELECTRICAL FINAL 11/28/2017 EW | $30.00 |
ELECTRICAL FINAL 11/29/2017 EW | $30.00 |
PLUMBTOPOUT/MECHRGH 09/15/2017 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 09/21/2017 GU | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
2NDS/FRAMING 09/26/2017 JDSM | $30.00 |
REPLACE READABLE REGISTER | $270.00 |
1 INCH CURBSTOP REPAIR / REPLACE | $270.00 |
1 INCH CURBSTOP REPAIR / REPLACE | $50.00 |
Total Fees: | $10,811.76 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ SHEATHING |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ SWROWINSP |
______ ELECTRICAL FINAL |
______ SWROWINSP |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ WATER REGISTER |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ ELECTRICAL FINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|