|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/14/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-03991
|
JOB ADDRESS: 11240 GERANIUM DR FRISCO, TX 75035 |
DESC:
2939 AC, 3740 SF, SFR / 1 STORY |
|
OWNER:
GEHAN HOMES LTD
15725 North Dallas Pkwy ste 300 FRISCO TX 75035
|
CONTRACTOR:
GEHAN HOMES LTD
15725 North Dallas Pkwy ste 300 FRISCO TX 75035
|
ISSUED DATE: 6/22/2017
APPLIED DATE:5/30/2017
EXPIRED DATE:7/11/2018
SITE APN:C2707279
STATUS:COMPLETED
|
|
APPLICANT:
GEHAN HOMES LTD
15725 North Dallas Pkwy ste 300 FRISCO TX 75035
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 219278.79
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 06/27/2017 BS | $80.00 |
THOROUGHFARE IMPACT FEE | $3,280.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
BUILDING PERMIT FEE | $1,593.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $240.00 |
MISCELLANOUS MECHANICAL FEES | $113.00 |
RESIDENTIAL ELECTRIC FEE | $112.20 |
PLAN REVIEW FEE | $50.00 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $0.60 |
ELECTRICAL ROUGH IN 09/18/2017 EW | $30.00 |
SHEATHING 09/18/2017 EW | $30.00 |
2NDS/FRAMING 09/18/2017 EW | $30.00 |
DRY WALL 10/11/2017 EW | $30.00 |
PLUMBTOPOUT/MECHRGH 09/07/2017 GU | $30.00 |
PLUMBTOPOUT/MECHRGH 09/07/2017 GU | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
Total Fees: | $9,598.55 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ ELECTRICAL ROUGH IN |
______ SHEATHING |
______ 2NDS/FRAMING |
______ SHEATHING |
______ INSULATION |
______ 2NDS/FRAMING |
______ SHEATHING |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ LATH |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|