|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/2/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-03587
|
JOB ADDRESS: 3404 HARVEST GLEN DR FRISCO, TX |
DESC:
4716 AC, 5413 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
ADDISON TX 75001
|
ISSUED DATE: 6/12/2017
APPLIED DATE:4/28/2017
EXPIRED DATE:9/24/2018
SITE APN:D677554
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 351860.76
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
SHEATHING 09/21/2017 CCM | $30.00 |
SHEATHING 09/29/2017 CCM | $30.00 |
2NDS/FRAMING 10/05/2017 CCM | $30.00 |
INSULATION 10/16/2017 CCM | $30.00 |
INSULATION 10/18/2017 CCM | $30.00 |
BRICK/WALL TIES 10/20/2017 CCM | $30.00 |
DRY WALL 10/27/2017 CCM | $30.00 |
PLUMBTOPOUT/MECHRGH 09/29/2017 CK | $30.00 |
BUILDING PERMIT FEE | $2,253.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $277.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $162.39 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
T-POLE 06/13/2017 JDR | $30.00 |
SLAB 06/28/2017 JDR | $30.00 |
GAS RELEASE 12/28/2017 JWF | $30.00 |
UTILITIES INSPECTION 03/21/2018 CB | $80.00 |
PLUMBING ROUGH-IN 06/14/2017 PJ | $30.00 |
PLUMBING ROUGH-IN 06/15/2017 PJ | $30.00 |
PLUMBING ROUGH-IN 06/19/2017 PJ | $30.00 |
PLUMBMECHFINAL 03/15/2018 SDC | $30.00 |
Total Fees: | $11,632.94 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ LATH |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ SWROWINSP |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ REPL 1 PD METER |
______ CO/BUILDING FINAL |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|