Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/25/2017 PERMIT SUB-TYPE: CIFO PERMIT NO: B17-03143
JOB ADDRESS:
7776 MAIN ST 200
FRISCO, TX 75033
DESC:   2830 SQ FT, CIFO / BIRKENSTOCK
OWNER:
BIRK HOLDINGS INC

FRISCO TX 75033-3494

CONTRACTOR:
BELLATOR CONSTRUCTION & DEVELOPMENT

FRISCO TX 75033
ISSUED DATE:
7/28/2017
APPLIED DATE:
5/9/2017
EXPIRED DATE:
7/11/2018
SITE APN:
C936688
STATUS:
COMPLETED
APPLICANT:
BELLATOR CONSTRUCTION & DEVELOPMENT

FRISCO TX 75033
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
78645
FEE SUMMARY
INSPECTION SUMMARY
COMMERCIAL BUILDING PERMIT FEE$508.05
COMMERCIAL ELECTRIC FEE$143.00
MISCELLANEOUS PLUMBING FEES$142.00
MISCELLANOUS MECHANICAL FEES$171.00
Total Fees:$964.05
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  FRAME/ELEC WALL
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  COMM FRAME
______  MECHANICAL ROUGH
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  FOOTINGS
______  FLATWORK
______  PLUMBING TOP OUT
______  ELECTRICAL ROUGH IN
______  MECHANICAL ROUGH
______  MECHANICAL ROUGH
______  COMM FRAME
______  MECHANICAL ROUGH
______  PLUMBING TOP OUT
______  MECHANICAL ROUGH
______  COMM DRYWALL
______  GAS PRESSURE
______  COMM PLUMB TOP OUT
______  MECHANICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  COMM CO
______  FIRE FINAL
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)