Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 6/6/2017 PERMIT SUB-TYPE: CIFO PERMIT NO: B17-02985
JOB ADDRESS:
15910 ELDORADO PKWY 100
FRISCO, TX 75035
DESC:   2500 SQ FT, CIFO / STARWOOD CAFE
OWNER:
CUSTER STAR II LP

DALLAS TX 75205-1187

CONTRACTOR:
R & A CONSTRUCTION

MESQUITE TX 75181
ISSUED DATE:
6/27/2017
APPLIED DATE:
5/5/2017
EXPIRED DATE:
7/18/2018
SITE APN:
C2736088
STATUS:
COMPLETED
APPLICANT:
BEAR DESIGN BUILD

DALLAS TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
180000
FEE SUMMARY
INSPECTION SUMMARY
FIRE DEPT INSPECTION FEES$50.00
PAVING 10/02/2017 CW$35.00
HEALTH FINAL 01/10/2018 DML$35.00
CREDIT CARD FEE$26.93
COMMERCIAL BUILDING PERMIT FEE$836.25
COMMERCIAL ELECTRIC FEE$130.00
MISCELLANEOUS PLUMBING FEES$225.00
MISCELLANOUS MECHANICAL FEES$155.00
CREDIT CARD FEE$1.40
FIRE DEPT INSPECTION FEES$75.00
FIRE DEPT INSPECTION FEES$75.00
Total Fees:$1,644.58
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  FRAME/ELEC WALL
______  ELECTRICAL ROUGH IN
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  COMM DRYWALL
______  COMM DRYWALL
______  ELECTRICAL RELEASE
______  GREASE TRAP
______  PAVING
______  PAVING
______  MECHANICAL ROUGH
______  AUTOFIRE SPRK VISUAL
______  CEILING
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  BACKFLOW
______  COURTESY HEALTH INSP
______  PLUMBING FINAL
______  PLUMBING FINAL
______  MECHANICAL FINAL
______  MECHANICAL FINAL
______  HEALTH FINAL
______  HEALTH FINAL
______  FIRE FINAL
______  COMM CO
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)