Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/3/2017 PERMIT SUB-TYPE: SNEW PERMIT NO: B17-02482
JOB ADDRESS:
11422 TERESA LN
FRISCO, TX 75035
DESC:   2522 AC, 3322 SF, SFR / 1 STORY
OWNER:
BEAZER HOMES TEXAS LP

DALLAS TX 75234-9010

CONTRACTOR:
BEAZER HOMES

DALLAS TX 75234
ISSUED DATE:
5/25/2017
APPLIED DATE:
4/18/2017
EXPIRED DATE:
8/29/2018
SITE APN:
C2738950
STATUS:
COMPLETED
APPLICANT:
BEAZER HOMES

DALLAS TX 75234
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
188166.42
FEE SUMMARY
INSPECTION SUMMARY
BRICK/WALL TIES 09/18/2017 ARG$30.00
ELECTRICAL FINAL 10/04/2017 ARG$30.00
ELECTRICAL FINAL 10/09/2017 ARG$30.00
UTILITIES INSPECTION 10/31/2017 CB$80.00
UTILITIES INSPECTION 11/03/2017 CB$80.00
GAS RELEASE 10/10/2017 CI$30.00
GAS RELEASE 10/11/2017 CI$30.00
T-POLE 06/21/2017 DE$30.00
WATER IMPACT FEE$806.00
BUILDING PERMIT FEE$1,438.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$219.00
MISCELLANOUS MECHANICAL FEES$113.00
RESIDENTIAL ELECTRIC FEE$99.66
PLAN REVIEW FEE$50.00
WATER METER DEPOSIT$125.00
1 INCH PD METER$410.00
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
FLATWORK 10/05/2017 REED$30.00
PLUMBTOPOUT/MECHRGH 08/01/2017 SDC$30.00
PLUMBTOPOUT/MECHRGH 08/03/2017 SDC$30.00
PLUMBTOPOUT/MECHRGH 08/03/2017 SDC$30.00
PLUMBTOPOUT/MECHRGH 08/08/2017 SDC$30.00
PLUMBTOPOUT/MECHRGH 08/14/2017 SDC$30.00
PLUMBTOPOUT/MECHRGH 08/14/2017 SDC$30.00
Total Fees:$4,331.41
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  SLAB
______  SWROWINSP
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  ELECTRICAL FINAL
______  FLATWORK
______  ELECTRICAL FINAL
______  FLATWORK
______  FLATWORK
______  ELECTRICAL FINAL
______  FLATWORK
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  GAS RELEASE
______  GAS RELEASE
______  PLUMBMECHFINAL
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  WATER REGISTER
______  SET 1 1/2 PD METER
______  SET 1 PD METER
______  SET 2 CMPND METER
______  CO/BUILDING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)