|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/1/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-01865
|
JOB ADDRESS: 5059 NORTHSHORE DR FRISCO, TX 75034-7572 |
DESC:
4462 AC, 5534 SF, SFR / 2 STORY |
|
OWNER:
LAER TRAMS CO LLC DBA REFLECTION HOMES
17330 PRESTON ROAD STE 100B ADDISON TX 75001
|
CONTRACTOR:
LAER TRAMS CO LLC DBA REFLECTION HOMES
17330 PRESTON ROAD STE 100B ADDISON TX 75001
|
ISSUED DATE: 5/5/2017
APPLIED DATE:4/7/2017
EXPIRED DATE:9/25/2018
SITE APN:D206453
STATUS:COMPLETED
|
|
APPLICANT:
LAER TRAMS CO LLC DBA REFLECTION HOMES
17330 PRESTON ROAD STE 100B ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 332909.82
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 09/08/2017 CCM | $30.00 |
2NDS/FRAMING 09/13/2017 CCM | $30.00 |
DRY WALL 10/03/2017 CCM | $30.00 |
BUILDING PERMIT FEE | $2,158.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $333.00 |
MISCELLANOUS MECHANICAL FEES | $165.50 |
RESIDENTIAL ELECTRIC FEE | $166.02 |
ELECTRICAL FINAL 12/14/2017 DE | $30.00 |
FLATWORK 12/28/2017 DE | $30.00 |
SLAB 06/08/2017 JDR | $30.00 |
SLAB 06/13/2017 JDR | $30.00 |
PLUMBING TOP OUT 08/23/2017 JWF | $30.00 |
PLUMBING ROUGH-IN 05/12/2017 SDC | $30.00 |
GAS RELEASE 12/14/2017 SDC | $30.00 |
Total Fees: | $3,143.27 |
|
|
| ______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBTOPOUT AND MECHRGH |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ SHEATHING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ LATH |
______ UTILITIES INSPECTION |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ ELECTRICAL FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|