|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/12/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-01532
|
JOB ADDRESS: 13290 MARBELLA DR FRISCO, TX 75035 |
DESC:
3176 AC, 3993 SF, SFR / 2 STORY |
|
OWNER:
IMPRESSION HOMES
SOUTHLAKE TX 76092
|
CONTRACTOR:
IMPRESSION HOMES
SOUTHLAKE TX 76092
|
ISSUED DATE: 4/19/2017
APPLIED DATE:3/24/2017
EXPIRED DATE:6/2/2019
SITE APN:C2711940
STATUS:COMPLETED
|
|
APPLICANT:
IMPRESSION HOMES
SOUTHLAKE TX 76092
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 215324.46
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
BUILDING PERMIT FEE | $1,573.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $242.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
RESIDENTIAL ELECTRIC FEE | $119.79 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $10.00 |
CREDIT CARD FEE | $3.20 |
CREDIT CARD FEE | $3.20 |
UTILITIES INSPECTION 08/28/2018 NMN | $80.00 |
UTILITIES INSPECTION 09/06/2018 NMN | $80.00 |
UTILITIES INSPECTION 09/11/2018 NMN | $80.00 |
UTILITIES INSPECTION 09/20/2018 NMN | $80.00 |
2NDS/FRAMING 09/19/2017 REED | $30.00 |
INSULATION 10/04/2017 REED | $30.00 |
BRICK/WALL TIES 10/19/2017 REED | $30.00 |
PLUMBTOPOUT/MECHRGH 08/21/2017 SDC | $30.00 |
PLUMBTOPOUT/MECHRGH 08/24/2017 SDC | $30.00 |
PLUMBTOPOUT/MECHRGH 08/29/2017 SDC | $30.00 |
Total Fees: | $3,115.04 |
|
|
| ______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|