|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/27/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-01293
|
JOB ADDRESS: 13332 TARRAGONA CT FRISCO, TX |
DESC:
2730 AC, 3545 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 4/11/2017
APPLIED DATE:3/23/2017
EXPIRED DATE:4/23/2018
SITE APN:D693752
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 203685.3
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SHEATHING 05/31/2017 ARG | $30.00 |
SHEATHING 06/05/2017 ARG | $30.00 |
2NDS/FRAMING 06/22/2017 ARG | $30.00 |
2NDS/FRAMING 06/26/2017 ARG | $30.00 |
2NDS/FRAMING 06/29/2017 ARG | $30.00 |
CREDIT CARD FEE | $2.40 |
PLUMBTOPOUT/MECHRGH 06/16/2017 SDC | $30.00 |
PLUMBTOPOUT/MECHRGH 06/19/2017 SDC | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
RESIDENTIAL ELECTRIC FEE | $117.09 |
MISCELLANOUS MECHANICAL FEES | $113.00 |
MISCELLANEOUS PLUMBING FEES | $212.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,513.75 |
SEWER IMPACT FEE | $1,982.00 |
WATER IMPACT FEE | $2,439.00 |
THOROUGHFARE IMPACT FEE | $4,597.00 |
Total Fees: | $11,741.24 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|