|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/15/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-00943
|
JOB ADDRESS: 2015 ALCOVE DR FRISCO, TX |
DESC:
3682 AC, 4554 SF, SFR / 2 STORY |
|
OWNER:
ASHTON WOODS HOMES
FARMERS BRANCH TX 75234
|
CONTRACTOR:
ASHTON WOODS HOMES
FARMERS BRANCH TX 75234
|
ISSUED DATE: 3/28/2017
APPLIED DATE:2/23/2017
EXPIRED DATE:5/8/2018
SITE APN:D677566
STATUS:COMPLETED
|
|
APPLICANT:
ASHTON WOODS HOMES
FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 274714.02
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 04/04/2017 TJS | $80.00 |
FLATWORK 09/20/2017 CCM | $30.00 |
ELECTRICAL FINAL 09/27/2017 CCM | $30.00 |
GAS RELEASE 09/27/2017 CK | $30.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $1,619.00 |
BUILDING PERMIT FEE | $1,868.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $273.00 |
MISCELLANOUS MECHANICAL FEES | $179.00 |
RESIDENTIAL ELECTRIC FEE | $136.62 |
2NDS/FRAMING 06/30/2017 JDR | $30.00 |
WATER METER DEPOSIT | $125.00 |
1 INCH PD METER | $410.00 |
PLUMBTOPOUT/MECHRGH 06/13/2017 PJ | $30.00 |
PLUMBTOPOUT/MECHRGH 06/14/2017 PJ | $30.00 |
WATER IMPACT FEE | $1,772.00 |
2NDS/FRAMING 07/11/2017 WND | $30.00 |
Total Fees: | $6,693.37 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ LATH |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|