|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/27/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-00744
|
JOB ADDRESS: 3327 STARLING DR FRISCO, TX |
DESC:
3729 AC, 4586 SF, SFR / 2 STORY |
|
OWNER:
ASHTON WOODS HOMES
FARMERS BRANCH TX 75234
|
CONTRACTOR:
ASHTON WOODS HOMES
FARMERS BRANCH TX 75234
|
ISSUED DATE: 3/3/2017
APPLIED DATE:2/14/2017
EXPIRED DATE:3/28/2018
SITE APN:D677584
STATUS:COMPLETED
|
|
APPLICANT:
ASHTON WOODS HOMES
FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 278220.69
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
UTILITIES INSPECTION 09/21/2017 CB | $80.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $0.00 |
BUILDING PERMIT FEE | $1,888.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $137.58 |
2NDS/FRAMING 05/24/2017 JDR | $30.00 |
PLUMBTOPOUT/MECHRGH 05/12/2017 PJ | $30.00 |
ELECTRICAL FINAL 08/16/2017 WND | $30.00 |
1 INCH PD METER | $410.00 |
WATER METER DEPOSIT | $125.00 |
PLUMBING ROUGH-IN 03/22/2017 PJ | $30.00 |
INSULATION 06/02/2017 JDR | $30.00 |
Total Fees: | $7,029.33 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ LATH |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|