BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/20/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-00620
|
JOB ADDRESS: 716 THOROUGHBRED AVE FRISCO, TX |
DESC:
3405 AC, 4234 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 2/24/2017
APPLIED DATE:2/6/2017
EXPIRED DATE:2/13/2018
SITE APN:D695555
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 254047.05
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
UTILITIES INSPECTION 08/03/2017 CB | $80.00 |
BUILDING PERMIT FEE | $1,768.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $270.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $127.02 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
1 INCH CURBSTOP REPAIR / REPLACE | $320.00 |
T-POLE 02/28/2017 JWF | $30.00 |
PLUMBMECHFINAL 07/27/2017 JWF | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
PLUMBING ROUGH-IN 03/15/2017 PJ | $30.00 |
2NDS/FRAMING 05/11/2017 REED | $30.00 |
PLUMBING ROUGH-IN 03/17/2017 SDC | $30.00 |
Total Fees: | $10,598.77 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ T-POLE |
______ ELECTRICAL ROUGH IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ PLUMBMECHFINAL |
______ SWROWINSP |
______ SWROWINSP |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|