BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/20/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-00602
|
JOB ADDRESS: 3371 STARLING DR FRISCO, TX |
DESC:
4439 AC, 5075 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
ADDISON TX 75001
|
CONTRACTOR:
GRAND HOMES
ADDISON TX 75001
|
ISSUED DATE: 2/27/2017
APPLIED DATE:2/2/2017
EXPIRED DATE:3/28/2018
SITE APN:D677582
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 331193.79
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 04/17/2017 CB | $30.00 |
UTILITIES INSPECTION 09/18/2017 CB | $80.00 |
PLUMBMECHFINAL 09/27/2017 CK | $30.00 |
BUILDING PERMIT FEE | $2,153.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $256.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
RESIDENTIAL ELECTRIC FEE | $152.25 |
PLAN REVIEW FEE | $50.00 |
THOROUGHFARE IMPACT FEE | $0.00 |
WATER IMPACT FEE | $0.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $0.60 |
SHEATHING 05/25/2017 JDR | $30.00 |
SHEATHING 06/05/2017 JDR | $30.00 |
2NDS/FRAMING 06/21/2017 JDR | $30.00 |
2NDS/FRAMING 06/23/2017 JDR | $30.00 |
INSULATION 06/30/2017 JDR | $30.00 |
PLUMBING ROUGH-IN 04/04/2017 CI | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
REPLACE READABLE REGISTER | $270.00 |
PLUMBING ROUGH-IN 03/31/2017 PJ | $30.00 |
PLUMBTOPOUT/MECHRGH 06/08/2017 PJ | $30.00 |
INSULATION 07/03/2017 WND | $30.00 |
DRY WALL 07/11/2017 WND | $30.00 |
FLATWORK 08/07/2017 WND | $30.00 |
FLATWORK 08/08/2017 WND | $30.00 |
ELECTRICAL FINAL 08/28/2017 WND | $30.00 |
Total Fees: | $6,204.10 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ WATER REGISTER |
______ SWROWINSP |
______ SWROWINSP |
______ LATH |
______ UTILITIES INSPECTION |
______ LATH |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|