Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 2/28/2017 PERMIT SUB-TYPE: SNEW PERMIT NO: B17-00462
JOB ADDRESS:
16178 BUFFALO GRASS RD
FRISCO, TX
DESC:   3304 AC, 4387 SF, SFR / 1 STORY
OWNER:
MHI COVENTRY PLANTATION

HOUSTON TX 77063

CONTRACTOR:
MHI COVENTRY PLANTATION

HOUSTON TX 77063
ISSUED DATE:
2/28/2017
APPLIED DATE:
1/27/2017
EXPIRED DATE:
1/21/2018
SITE APN:
D681872
STATUS:
COMPLETED
APPLICANT:
MHI COVENTRY PLANTATION

HOUSTON TX 77063
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
246511.44
FEE SUMMARY
INSPECTION SUMMARY
2NDS/FRAMING 05/01/2017 ARG$30.00
INSULATION 05/04/2017 ARG$30.00
ELECTRICAL FINAL 06/08/2017 ARG$30.00
ELECTRICAL FINAL 06/13/2017 ARG$30.00
WATER IMPACT FEE$426.00
SEWER IMPACT FEE$1,619.00
CREDIT CARD FEE$86.27
CREDIT CARD FEE$3.00
CREDIT CARD FEE$1.20
FLATWORK 03/23/2017 EW$30.00
BUILDING PERMIT FEE$1,728.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$242.00
MISCELLANOUS MECHANICAL FEES$146.00
RESIDENTIAL ELECTRIC FEE$131.61
WATER METER DEPOSIT$125.00
1 INCH PD METER$410.00
PLUMBTOPOUT/MECHRGH 04/25/2017 MLM$30.00
PLUMBTOPOUT/MECHRGH 04/27/2017 MLM$30.00
Total Fees:$5,148.83
______  T-POLE
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  FLATWORK
______  SLAB
______  CAMERA
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  SHEATHING
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  LATH
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  GAS RELEASE
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)