|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/27/2017
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B17-00266
|
JOB ADDRESS: 755 BANNERDALE BLVD FRISCO, TX |
DESC:
3760 AC, 44385 SF, SFR / 2 STORY |
|
OWNER:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway Houston TX 77017
|
CONTRACTOR:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway Houston TX 77017
|
ISSUED DATE: 1/30/2017
APPLIED DATE:1/18/2017
EXPIRED DATE:3/27/2018
SITE APN:D695503
STATUS:COMPLETED
|
|
APPLICANT:
BRITTON HOMES / PERRY HOMES CO
9000 Gulf Freeway Houston TX 77017
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 280533.6
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBTOPOUT/MECHRGH 06/30/2017 CI | $30.00 |
BUILDING PERMIT FEE | $1,898.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $263.00 |
MISCELLANOUS MECHANICAL FEES | $146.00 |
RESIDENTIAL ELECTRIC FEE | $133.14 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $1,619.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.80 |
CREDIT CARD FEE | $0.60 |
2NDS/FRAMING 07/06/2017 JDR | $30.00 |
FLATWORK 09/05/2017 JDR | $30.00 |
PLUMBMECHFINAL 09/19/2017 JWF | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
PLUMBING ROUGH-IN 03/02/2017 SDC | $30.00 |
SHEATHING 06/22/2017 WND | $30.00 |
Total Fees: | $10,361.49 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ PLUMBMECHFINAL |
______ UTILITIES INSPECTION |
______ UTILITIES INSPECTION |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|