Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 1/27/2017 PERMIT SUB-TYPE: CIFO PERMIT NO: B17-00139
JOB ADDRESS:
1 COWBOYS WAY 290
FRISCO, TX
DESC:   8286 SQ FT, CIFO / THE STAR HEALTHCARE HIGHWAYS
OWNER:
BLUE STAR HQ INC

IRVING TX 75063-4999

CONTRACTOR:
ABSTRACT CONSTRUCTION CO

CARROLLTON TX 75006
ISSUED DATE:
1/27/2017
APPLIED DATE:
1/10/2017
EXPIRED DATE:
11/12/2017
SITE APN:
C2700170
STATUS:
COMPLETED
APPLICANT:
ABSTRACT CONSTRUCTION CO

CARROLLTON TX 75006
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
630000
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$4.97
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$248.58
COMMERCIAL BUILDING PERMIT FEE$2,310.75
COMMERCIAL ELECTRIC FEE$361.00
MISCELLANEOUS PLUMBING FEES$258.00
MISCELLANOUS MECHANICAL FEES$444.00
FIRE DEPT INSPECTION FEES$50.00
CREDIT CARD FEE$1.00
CREDIT CARD FEE$1.00
Total Fees:$3,729.30
______  MECHANICAL ROUGH
______  PLUMBING ROUGH-IN
______  COMM PLUMB TOP OUT
______  COMM PLUMB TOP OUT
______  PLUMBING ROUGH-IN
______  FRAME/ELEC WALL
______  COMM FRAME
______  COMM DRYWALL
______  CEILING
______  AUTOFIRE SPRK HYDRO
______  CEILING
______  FIRE FINAL
______  ELECTRICAL FINAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  COMM CO
______  BUILDING FINAL
______  ACCESS CONTROL ACCEP
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)