|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/2/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-4868
|
JOB ADDRESS: 1309 BONNEVILLE RD FRISCO, TX |
DESC:
3520 AC, 4255 SF, SFR / 2 STORY |
|
OWNER:
CALATLANTIC HOMES
IRVING TX 75039
|
CONTRACTOR:
CALATLANTIC HOMES
IRVING TX 75039
|
ISSUED DATE: 11/15/2016
APPLIED DATE:10/18/2016
EXPIRED DATE:1/28/2018
SITE APN:D677651
STATUS:COMPLETED
|
|
APPLICANT:
CALATLANTIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 262627.2
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SET 1 PD METER 11/28/2016 PXF | $80.00 |
UTILITY / ROW 06/27/2017 KB | $80.00 |
BUILDING PERMIT FEE | $1,808.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $249.00 |
MISCELLANOUS MECHANICAL FEES | $139.50 |
RESIDENTIAL ELECTRIC FEE | $127.65 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
PLUMBTOPOUT/MECHRGH 03/06/2017 PJ | $30.00 |
2NDS/FRAMING 03/08/2017 JWF | $30.00 |
BRICK/WALL TIES 03/20/2017 JWF | $30.00 |
INSULATION 03/21/2017 JWF | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
REPLACE DAMAGED/UNREADABLE REGISTER | $500.00 |
INSULATION 03/17/2017 REED | $30.00 |
SEWER IMPACT FEE | $1,619.00 |
Total Fees: | $10,871.90 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBMECHFINAL |
______ UTILITY / ROW |
______ UTILITIES INSPECTION |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ WATER REGISTER |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|