|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/19/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-4117
|
JOB ADDRESS: 2105 PROSPECT DR FRISCO, TX |
DESC:
4516 AC, 5915 SF, SFR / 2 STORY |
|
OWNER:
CALATLANTIC HOMES
IRVING TX 75039
|
CONTRACTOR:
CALATLANTIC HOMES
IRVING TX 75039
|
ISSUED DATE: 9/29/2016
APPLIED DATE:9/9/2016
EXPIRED DATE:12/11/2017
SITE APN:D680380
STATUS:COMPLETED
|
|
APPLICANT:
CALATLANTIC HOMES
IRVING TX 75039
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 336938.76
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 02/17/2017 ARG | $30.00 |
2NDS/FRAMING 02/21/2017 ARG | $30.00 |
SET 1 PD METER 11/22/2016 TJS | $80.00 |
BUILDING PERMIT FEE | $2,178.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $294.00 |
MISCELLANOUS MECHANICAL FEES | $172.50 |
RESIDENTIAL ELECTRIC FEE | $177.45 |
CREDIT CARD FEE | $0.60 |
CREDIT CARD FEE | $1.80 |
2NDS/FRAMING 03/01/2017 JWF | $30.00 |
INSULATION 03/02/2017 JWF | $30.00 |
DRY WALL 03/09/2017 JWF | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
PLUMBTOPOUT/MECHRGH 02/06/2017 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 02/10/2017 MLM | $30.00 |
THOROUGHFARE IMPACT FEE | $3,816.00 |
WATER IMPACT FEE | $1,772.00 |
SEWER IMPACT FEE | $0.00 |
Total Fees: | $9,233.10 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|