Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/12/2016 PERMIT SUB-TYPE: SNEW PERMIT NO: B16-3964
JOB ADDRESS:
12055 BIG SPRINGS DR
FRISCO, TX 75035
DESC:   3369 AC, 3981 SF, SFR / 2 STORY
OWNER:
SUMEER HOMES

IRVING TX 75062

CONTRACTOR:
SUMEER HOMES

IRVING TX 75062
ISSUED DATE:
9/22/2016
APPLIED DATE:
8/29/2016
EXPIRED DATE:
7/23/2018
SITE APN:
C2520105
STATUS:
COMPLETED
APPLICANT:
SUMEER HOMES

IRVING TX 75062
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
251361.09
FEE SUMMARY
INSPECTION SUMMARY
REPLACE DAMAGED/UNREADABLE REGISTER$500.00
CAMERA 12/01/2016 CB$30.00
CAMERA 03/16/2017 CB$30.00
UTILITIES INSPECTION 12/27/2017 CB$80.00
PLUMBTOPOUT/MECHRGH 03/23/2017 CK$30.00
PLUMBTOPOUT/MECHRGH 03/28/2017 CK$30.00
BUILDING PERMIT FEE$1,753.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$263.00
MISCELLANOUS MECHANICAL FEES$146.00
RESIDENTIAL ELECTRIC FEE$119.43
2NDS/FRAMING 04/27/2017 DE$30.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$3.00
CREDIT CARD FEE$0.60
CREDIT CARD FEE$1.20
CREDIT CARD FEE$11.80
CREDIT CARD FEE$0.60
2NDS/FRAMING 05/02/2017 EW$30.00
2NDS/FRAMING 05/05/2017 EW$30.00
DRY WALL 06/08/2017 EW$30.00
CO/BUILDING FINAL 01/18/2018 JWE2$30.00
REPLACEMENT CARD FEE$10.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$410.00
GAS RELEASE 08/24/2017 SDC$30.00
Total Fees:$3,719.98
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  CAMERA
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  BRICK/WALL TIES
______  INSULATION
______  DRY WALL
______  DRY WALL
______  FLATWORK
______  GAS RELEASE
______  ELECTRICAL FINAL
______  GAS RELEASE
______  UTILITIES INSPECTION
______  UTILITIES INSPECTION
______  WATER REGISTER
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  SET 1 PD METER
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)