|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/8/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-3939
|
JOB ADDRESS: 4388 LONGWOOD DR FRISCO, TX |
DESC:
4889 AC, 6376 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
ISSUED DATE: 9/14/2016
APPLIED DATE:8/24/2016
EXPIRED DATE:12/30/2017
SITE APN:D672255
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES OF TEXAS LLC
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 364768.29
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 05/19/2017 ARG | $30.00 |
UTILITY / ROW 06/21/2017 KB | $80.00 |
PLUMBTOPOUT/MECHRGH 02/13/2017 CK | $30.00 |
PLUMBTOPOUT/MECHRGH 02/17/2017 CK | $30.00 |
SHEATHING 01/20/2017 DE | $30.00 |
2NDS/FRAMING 02/22/2017 DE | $30.00 |
THOROUGHFARE IMPACT FEE | $4,378.00 |
WATER IMPACT FEE | $2,323.00 |
SEWER IMPACT FEE | $1,888.00 |
CREDIT CARD FEE | $2.40 |
CREDIT CARD FEE | $2.20 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
BUILDING PERMIT FEE | $2,318.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $301.00 |
MISCELLANOUS MECHANICAL FEES | $185.50 |
RESIDENTIAL ELECTRIC FEE | $191.28 |
GAS RELEASE 05/19/2017 SDC | $30.00 |
PLUMBMECHFINAL 06/23/2017 SDC | $30.00 |
Total Fees: | $12,410.13 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ CAMERA |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ LATH |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
______ PLUMBMECHFINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|