Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/2/2016 PERMIT SUB-TYPE: SNEW PERMIT NO: B16-3860
JOB ADDRESS:
13074 POSSUM KINGDOM DR
FRISCO, TX
DESC:   4765 AC, 5919 SF, SFR / 2 STORY
OWNER:
CALATLANTIC HOMES

IRVING TX 75039

CONTRACTOR:
CALATLANTIC HOMES

IRVING TX 75039
ISSUED DATE:
9/16/2016
APPLIED DATE:
8/24/2016
EXPIRED DATE:
3/18/2018
SITE APN:
D671948
STATUS:
COMPLETED
APPLICANT:
CALATLANTIC HOMES

IRVING TX 75039
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
355516.65
FEE SUMMARY
INSPECTION SUMMARY
UTILITY / ROW 06/14/2017 KB$80.00
PLUMBTOPOUT/MECHRGH 01/12/2017 CK$30.00
PLUMBTOPOUT/MECHRGH 01/18/2017 CK$30.00
BUILDING PERMIT FEE$2,273.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$312.00
MISCELLANOUS MECHANICAL FEES$159.00
RESIDENTIAL ELECTRIC FEE$177.57
2NDS/FRAMING 01/23/2017 DE$30.00
THOROUGHFARE IMPACT FEE$3,816.00
WATER IMPACT FEE$1,772.00
SEWER IMPACT FEE$1,619.00
WATER METER DEPOSIT$100.00
1 INCH PD METER$410.00
REPLACE READABLE REGISTER$270.00
PLUMBING ROUGH-IN 09/29/2016 PJ$30.00
PLUMBING ROUGH-IN 10/03/2016 PJ$30.00
Total Fees:$11,159.32
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  SLAB
______  CAMERA
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  PLUMBTOPOUT AND MECHRGH
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  DRY WALL
______  BRICK/WALL TIES
______  FLATWORK
______  ELECTRICAL FINAL
______  GAS RELEASE
______  UTILITY / ROW
______  WATER REGISTER
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  PLUMBMECHFINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)