Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 9/7/2016 PERMIT SUB-TYPE: CNEW PERMIT NO: B16-3826
JOB ADDRESS:
5977 PRESTON RD BLDG 001
FRISCO, TX 75034
DESC:   32900 SQ FT, CNEW/ PRESTON WADE CROSSING-R BUILDING 001
OWNER:
FRISCO WADE CROSSING DEVELOPME

FRISCO TX 75034-7460

CONTRACTOR:
EMJ CORPORATION

CHATTANOOGA TN 37421
ISSUED DATE:
2/6/2018
APPLIED DATE:
8/25/2016
EXPIRED DATE:
3/20/2019
SITE APN:
C2729984
STATUS:
COMPLETED
APPLICANT:
CROSSLAND CONSTRUCTION CO

PROSPER TX 75078
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
3058713
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD FEE$1.00
COMMERCIAL BUILDING PERMIT FEE$7,256.76
COMMERCIAL REVIEW FEE-E$688.00
MISCELLANEOUS PLUMBING FEES$1,017.00
MISCELLANOUS MECHANICAL FEES$45.00
THOROUGHFARE IMPACT FEE$0.00
WATER IMPACT FEE$0.00
SEWER IMPACT FEE$0.00
WATER METER DEPOSIT COMMERCIAL$1,125.00
2 INCH COMPOUND METER$1,850.00
CREDIT CARD FEE$59.50
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$50.00
FIRE DEPT INSPECTION FEES$987.00
FIRE DEPT INSPECTION FEES$50.00
Total Fees:$13,179.26
______  UNDRGR FIRE MAIN HYD
______  UNDRGR FIRE MAIN VIS
______  UNDRGR FIRE MAIN FLU
______  FOOTINGS
______  PLUMBING ROUGH-IN
______  COMM SLAB
______  TILT WALL PANELS
______  METER PAYMENT
______  BRICK/WALL TIES
______  FLATWORK
______  BRICK/WALL TIES
______  COMM FRAME
______  FRAME/ELEC WALL
______  AUTOFIRE SPRK HYDRO
______  ELECTRICAL RELEASE
______  PLUMBING ROUGH-IN
______  SET 2" CMPND METER
______  ELECTRICAL FINAL
______  FLATWORK
______  ELECTRICAL FINAL
______  FIRE FINAL
______  PLUMBING FINAL
______  BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)