|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/16/2016
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B16-3631
|
JOB ADDRESS: 3823 BROADMOOR WAY FRISCO, TX 75033 |
DESC:
5697 AC, 7401 SF, SFR / 2 STORY |
|
OWNER:
REYNOLDS SIGNATURE HOMES
FRISCO TX 75034
|
CONTRACTOR:
REYNOLDS SIGNATURE HOMES
FRISCO TX 75034
|
ISSUED DATE: 8/23/2016
APPLIED DATE:8/11/2016
EXPIRED DATE:1/29/2019
SITE APN:D613051
STATUS:EXPIRED
|
|
APPLICANT:
REYNOLDS SIGNATURE HOMES
FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 425053.17
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD FEE | $5.44 |
SET 1 PD METER 09/02/2016 PXF | $80.00 |
SHEATHING 02/15/2017 DE | $30.00 |
SHEATHING 02/27/2017 DE | $30.00 |
THOROUGHFARE IMPACT FEE | $4,378.00 |
WATER IMPACT FEE | $2,323.00 |
SEWER IMPACT FEE | $1,888.00 |
CREDIT CARD FEE | $1.60 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $3.00 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $1.20 |
CREDIT CARD FEE | $5.50 |
SHEATHING 03/01/2017 EW | $30.00 |
ELECTRICAL ROUGH IN 03/24/2017 EW | $30.00 |
2NDS/FRAMING 03/24/2017 EW | $30.00 |
INSULATION 04/10/2017 EW | $30.00 |
INSULATION 04/12/2017 EW | $30.00 |
PLAN REVIEW FEE | $50.00 |
BUILDING PERMIT FEE | $2,623.75 |
FENCE FEE | $20.00 |
MISCELLANEOUS PLUMBING FEES | $308.00 |
MISCELLANOUS MECHANICAL FEES | $185.50 |
RESIDENTIAL ELECTRIC FEE | $222.03 |
SLAB 10/04/2016 JDR | $30.00 |
WATER METER DEPOSIT | $100.00 |
1 INCH PD METER | $410.00 |
1.5 INCH PD METER | $175.00 |
REPLACE READABLE REGISTER | $275.00 |
PLUMBTOPOUT/MECHRGH 03/08/2017 MLM | $30.00 |
PLUMBTOPOUT/MECHRGH 03/21/2017 MLM | $30.00 |
UTILITIES INSPECTION 08/02/2018 NMN | $80.00 |
FIRE DEPT INSPECTION FEES | $272.03 |
PLUMBING ROUGH-IN 09/20/2016 PJ | $30.00 |
ELECTRICAL FINAL 02/15/2018 WND | $30.00 |
Total Fees: | $13,769.45 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 1/2 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ CAMERA |
______ SHEATHING |
______ SHEATHING |
______ SHEATHING |
______ CAMERA |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ PLUMBTOPOUT AND MECHRGH |
______ PLUMBTOPOUT AND MECHRGH |
______ SHEATHING |
______ 2NDS/FRAMING |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK/WALL TIES |
______ AUTOFIRE SPRK HYDRO |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ WATER REGISTER |
______ PLUMBMECHFINAL |
______ SWROWINSP |
______ UTILITIES INSPECTION |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|